Place of Origin: | China |
---|---|
Brand Name: | HUISEN |
Model Number: | HS-DD |
Minimum Order Quantity: | 100 pcs |
Price: | $2.6-3.2/pc |
Packaging Details: | Carton |
Delivery Time: | 7-15days |
Payment Terms: | T/T, Western Union |
Supply Ability: | 1000pcs/day |
Color: | Black/blue | Usage: | Aeration |
---|---|---|---|
Type: | Crown Type | Product Name: | 9 Inch Crown Type Disc Diffuser Aerator With 1-2mm Fine Bubble |
Membrane Material: | EPDM/silicone | Support Part Material: | ABS Support Part |
High Light: | moving bed biological reactor,mbbr carrier media |
9 inch Crown Type Disc Diffuser Aerator with 1-2mm Fine Bubble
Product Description
Microporous Crown type aerator and support tray have unique spherical cap structure. Structure and working principle: the spherical crown microporous aerator is mainly composed of aeration diaphragm, support tray, screw gland, threaded nozzle and other components. As long as the rubber diaphragm is sheathed on the support tray, screw gland can be used for tightening.
EPDM membrane is suitable for biological wastewater treatment and conventional industrial wastewater treatment, and the service temperature is 176 ℃.
The temperature of silicone menbrane is - 65 ℃ - 232 ℃, which is suitable for wastewater treatment in pulp and paper industry, petrochemical industry and oil refining process.
Model | HSPD260 |
Type | Crown Type |
Size | 9 inch(260mm) |
MOC | EPDM/silicone membrane |
ABS carrier plate | |
Connector | 3/4"NPT male thread |
Bubble Size | 1-2mm |
Flow Range(m³/h) | 1-8 |
Design Flow(m³/h) | 2-5 |
STOE | ≥38%(6m submerged) |
STOR(kg O2/h) | ≥0.42 |
SAE | ≥8.9kg O2/kw.h |
Headloss | 1500-4300pa |
Service Aera(m2) | 0.4-0.8 |
Service Life | >5 years |
During installation, the support tray (with G3 / 4 "internal thread airway in the center) shall be installed on the threaded joint at the top of the air distribution pipe. When the spherical crown microporous aerator works, the upper air distribution pipe enters the aeration diaphragm room through the supporting bracket airway.
Under the action of air pressure, the diaphragm is slightly bulged and the eyelet is opened, and micro bubbles with diameter less than 3mm can be produced in water. Stop the air supply, as the pressure between the diaphragm and the tray decreases gradually, as well as the resilience of the water pressure and the diaphragm itself, make the hole gradually closed, and compact the diaphragm on the support tray. Technical performance parameters: aeration size: 215 × 160mm; applicable working air volume: 0.8-0.3m3/h; service area: 0.35-0.6m3/h; oxygen utilization rate: 24-31%; oxygen charging capacity: 0.169-0.244kgo2/h; oxygen charging power efficiency: 6.5-6.8 kgo2 / h; resistance loss of aerator: ≤ 3200pa; arrangement, installation and commissioning of spherical aerator equipment can be supplied in complete set, accessories Including gas distribution pipe, pipe fitting, horizontal regulator, cleaning device, connector, etc.
The vertical layout dimension of the aerator is about 230mm from the surface to the bottom of the tank and 110mm from the air distribution center to the bottom of the tank. It can also be scheduled according to the user's requirements. The air distribution pipe should be connected into a ring network to ensure the uniformity of air distribution in the system. Each group shall be equipped with valves to facilitate the adjustment of air volume. The velocity of air duct is generally 10-15m / s for main pipe and 4-5m / s for branch pipe.
Debugging Mothed
Commissioning inspection method after the installation of aerator, put clear water into the tank, and the water surface to the surface of aerator is about 100-200mm. Then carry out the following three checks. In the process of water drainage and observation, observe whether the elevation of the aerator is on a horizontal plane, and adjust it (the bottom surface of the pool shall be level during the civil work, and the discharge outlet shall be reserved). Check whether there is air leakage in sealing treatment of all pipeline interfaces. Under the condition of standard ventilation capacity of 2m3 / h, check whether the air distribution of the aerator is uniform, and the ventilation area of each aerator shall be greater than 80%.